Notice of Construction Work in the 2nd Floor Lounge
- The second floor is currently closed due to construction. (Construction is scheduled to continue until the end of August.)
- The lounge area previously located on the second floor has been relocated to the first floor and is available from 16:00 to 22:00.
- Terrace seating is available 24 hours a day.












