Notice of Non-Statutory Exterior Wall Construction and Percussion Inspection
Due to legally required periodic inspections, sounding tests of the Hotel’s exterior walls and exterior wall repair work will be carried out.
As a result, noise may occur during the period below.
During working hours, gondolas will be used, and workers may pass by outside guestroom windows.
[Period] October 1, 2026 – February 2027 (scheduled)
[Working Hours] 9:00–17:00 (scheduled)
- Depending on the work being performed, noise and vibrations may occur during the construction period.
- The building will not be covered; however, as gondolas will be used, workers on the gondola may pass by outside your window.
- When a gondola passes by, opening and closing of windows may be restricted.
We apologize for any inconvenience this may cause during your stay. We will carry out the work with full attention to safety and appreciate your understanding and cooperation.











